What are the 17 key points of pneumatic conveying system design?

Source:http://m.ccgshp.cn/ Release time:2022-02-07 1Second

What are the 17 key points of pneumatic conveying system design?

In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Dag-type dust collector

    Dag-type dust collector

  • Dag-type dust collector

    Dag-type dust collector

  • Warehouse top dust collector

    Warehouse top dust collector

  • Ash suction machine

    Ash suction machine

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 成人亚洲欧美日韩在线观看| 欧美精品1区| 成人精品一区二区久久| 欧美人成在线观看网站高清| 日韩福利| a站是指哪个网站| 久久福利青草精品资源站| 沈樵在线观看国产专区| 一级aaa毛片| 国产精品一区二区在线播放| 久久精品国产欧美日韩亚洲| hentai movies| 潜艇总动员| 超污视频| 国产精品久草| 国产乱子伦视频大全| 日韩欧美在线播放| 国产成人综合91香蕉| 99久久亚洲精品影院| 中文字幕日本在线| 成人午夜毛片| 中文字幕久久精品| 威尼斯欢乐娱人城aⅴ大中国| 花蝴蝶在线观看免费看mv| 欧美人成在线观看网站高清| 久久久久国产免费| 久久精品国产99精品国产2021 | 国产视频黄| 久草午夜| 久久综合久久综合久久| 国产欧美日韩在线一区二区不卡 | 久久伊人网站| 久久亚洲人成国产精品| www.91免费视频| japanese中文字幕| a级黄色免费看| 非洲特黄一级毛片高清视频| 99热伊人| 久久亚洲国产成人精品性色| 欧美亚洲一区二区三区在线| 亚洲欧美日韩中文字幕在线一|